Local traffic restrictions and roadworks from 15 October

Traffic restrictions and roadworks starting within the next week for the Reepham district have been issued by one.network on 15 October 2019.
 
A1067 Fakenham Road, Attlebridge
16 – 18 October
Delays likely - Lane closure
Works location: As plan
Works description: Surveying
Responsibility for works: Norfolk
Works reference: HU118AW1083
 
B1145 Aylsham Road, Cawston
17 – 21 October
Delays likely - Traffic control (two-way signals)
Works location: From approx 213m south west of the junc with Holt Road to the junc with Perrys Lane on Aylsham Road
Works description: REEPHAM 13 - DSLAM 643905 - desiliting – Required on sections of duct in order to complete spine route to exchange area
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00IBYL84GT08
 
B1145 Aylsham Road, Cawston
17 – 23 October
Delays likely - Traffic control (multi-way signals)
Works location: from the junction with Old Friendship Lane to the junction with High Street on Aylsham Road
Works description: REEPHAM 644040 - desiliting – Required on sections of duct in order to complete spine route to exchange area
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00IBYL8CCL15
 
B1145 Cawston Road, Cawston
17 – 23 October
Delays likely - Traffic control (two-way signals)
Works location: from the junction with High Street to approx 230m northwest on Cawston Road
Works description: REEPHAM 644040 - desiliting – Required on sections of duct in order to complete spine route to verge/cw exchange area
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00IBYL8CCL11
 
B1145 High Street, Cawston
17 – 23 October
Delays likely - Traffic control (multi-way signals)
Works location: from the junction with Cawston Road to the junction with Aylsham Road on High Street
Works description: REEPHAM 644040 - desiliting – Required on sections of duct in order to complete spine route to verge/cw exchange area
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00IBYL8CCL13
 
B1145 High Street, Cawston
21 – 25 October
Delays likely - Road closure
Works location: At bridge no. TG12306
Works description: Bridge maintenance works to repair accident damage
Responsibility for works: Norfolk
Works reference: HU607TG12306LTBR10
 
B1145 Reepham Road, Bawdeswell
16 – 17 October
Delays likely - Traffic control (two-way signals)
Works location: Near between The Shetlands and Dale Farmhouse on the Bawdeswell to Reepham road
Works description: “Damaged sign” re-fix signs and post from fallen tree sign post and sign not damaged but under fallen tree will need a chainsaw to cut tree back to be able to get signs and post out to reset them tss band 4 60mph 6m road tma 2way traffic lights
Responsibility for works: Norfolk
Works reference: HU10900017826
 
B1149 Holt Road, Cawston
15 – 17 October
Delays likely - Traffic control (multi-way signals)
Works location: Junction with Buxton Road
Works description: Excavate and replace fire hydrant
Responsibility for works: Anglian Water
Works reference: AD03153044154
 
B1535 Heath Road, Weston Longville
17 – 18 October
Delays likely - Traffic control (two-way signals)
Works location: 10m to right of access to Loke Farm
Works description: Meter exchange
Responsibility for works: Anglian Water
Works reference: AD03056726386
 
Buxton Road, Cawston
15 – 17 October
Delays likely - Traffic control (multi-way signals)
Works location: Junction with Holt Road
Works description: Signal header for works under AD031 53044154
Responsibility for works: Anglian Water
Works reference: AD03153044154/1
 
Old School Road, Guestwick
23 – 25 October
Delays likely - Road closure
Works location: Approx 90m west of Old School House
Works description: New water connection for the White House
Responsibility for works: Anglian Water
Works reference: AD03010533446
 
School Road, Reepham
21 – 24 October
Delays likely - Road closure
Works location: Near 31
Works description: Connecting to existing main to provide source of water for new development
Responsibility for works: Anglian Water
Works reference: AD030H10545693
 
Chapel Street, Cawston
17 – 23 October
Delays possible - Traffic control (multi-way signals)
Works location: Junction with Aylsham Road on Chapel Street
Works description: REEPHAM 644040 - traffic management to facilitate BT Openreach fibre cabling works – portable traffic light heads only, linked with BC005MU1WSEP00IBYL8CCL13/15
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00IBYL8CCL14
 
Heydon Road, Cawston
17 – 23 October
Delays possible - Traffic control (multi-way signals)
Works location: junction with High Street on Heydon Road
Works description: REEPHAM 644040 - traffic management to facilitate BT Openreach fibre cabling works – portable traffic light heads only, linked with BC005MU1WSEP00IBYL8CCL13/15
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00IBYL8CCL12
 
Aylsham Road Service Road, Cawston
18 – 22 October
Delays unlikely - Some carriageway incursion
Works location: Aylsham Road Service Road, O/S No. 21, NR10 4AT
Works description: Disconnect and remove BT telephone kiosk
Responsibility for works: Openreach
Works reference: BC005PP25W00001603871441
 
Bexfield Road, Foulsham
17 – 21 October
Delays unlikely - Traffic control (give & take)
Works location: O/S no.10
Works description: Footway patching.
Responsibility for works: Norfolk
Works reference: HU608134466LTPA
 
Heydon Road, Cawston
21 – 25 October
Delays unlikely - Traffic control (give & take)
Works location: Junc High Street, Cawston
Works description: Welfare unit and tool store area for works on Cawston Bridge
Responsibility for works: Norfolk
Works reference: HU607TG12306LTBR5
 
Reepham Road, Foulsham
18 October
Delays unlikely - No carriageway incursion
Works location: Outside Bush Farm Barn verge
Works description: connections small service: installation of a new electricity supply for a customer: excavate 1m at the base of the pole in verge NO TM
Responsibility for works: UK Power Networks Eastern & London
Works reference: EC30034828741