Local traffic restrictions and roadworks from 3 December

Traffic restrictions and roadworks starting within the next week for the Reepham district have been issued by one.network on 3 December 2019
 
B1145 Station Road, Reepham
3–5 December
Delays likely - Traffic control (multi-way signals)
Works location: From near the junction with Stony Lane to approx 48m NE on Station Road
Works description: REEPHAM - 706833 - diversionary works – Lay approx 48m of duct 54/56 in fw/cw/verge to link existing BT boxes to facilitate spine cabling works
Responsibility for works: Openreach
Works reference: BC006MU1WBAUSEIBZ6K2HG01
 
B1149 Norwich Road, Corpusty
4–6 December
Delays likely - Traffic control (multi-way signals)
Works location: Norwich Road- from j/w The Street to 71m SE of j/w The Street
Works description: SAXTHORPE V5001 - PON 539133 - blockages – Excavate onto BT ducts for the clearance of duct blockages in to facilitate spine cabling works
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00IBUH0MDU41
 
Briston Road, Wood Dalling
9–13 December
Delays likely - Road closure
Works location: From near the junction with Church Hill to opposite 2 Briston Road
Works description: SAXTHORPE 9 - DSLAM 570154, 570165 - street cabinet and power installation. Excavate to lay approx 5m BT ducts, Lay concrete plinth, stand cab. Excavate to expose low voltage cable for power connection and lay approx 76m duct. Power engineer to carry out inspection prior to jointing. Power jointing team to insert cable and execute jointing works. Reinstate, check and clear site
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00IBW55WLV01
 
Church Hill, Wood Dalling
9–13 December
Delays likely - Road closure
Works location: From near the junction with Briston Road to opposite Half Acre on Church Hill
Works description: SAXTHORPE 9 - DSLAM 570154, 570165 - street cabinet and power installation. Excavate to lay approx 39m BT ducts, Lay concrete plinth, stand cab. Excavate to expose low voltage cable for power connection. Power engineer to carry out inspection prior to jointing. Power jointing team to insert cable and execute jointing works. Reinstate, check and clear site.
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00IBW55WLV02
 
Corpusty Mill, Corpusty
4 – 6 December
Delays likely - Traffic control (multi-way signals)
Works location: Corpusty Mill -from o/s mill to j/w Norwich Road
Works description: SAXTHORPE V5001 - PON 539133 - blockages – Excavate onto BT ducts for the clearance of duct blockages in to facilitate spine cabling works
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00IBUH0MDU40
 
High Street, Foulsham
10–23 December
Delays likely - Traffic control (multi-way signals)
Works location: High Street - from, o/s 31 to o/s 41
Works description: FOULSHAM 8 - DSLAM 709255 - overlay – lay approx 89m of duct 54/56 in f/way and c/way to link existing BT boxes to facilitate spine cabling works
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00WAPR927S01
 
Market Hill, Foulsham
10–23 December
Delays likely - Traffic control (multi-way signals)
Works location: Market Hill - from o/s 4 to o/s Market House
Works description: FOULSHAM 8 - DSLAM 709255 - overlay – lay approx 89m of duct 54/56 in f/way and c/way to link existing BT boxes to facilitate spine cabling works
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00WAPR927S02
 
New Road, Reepham
3–5 December
Delays likely - Traffic control (multi-way signals)
Works location: Near the junction with Station Road on New Road
Works description: REEPHAM 706833 - traffic management to facilitate BT Openreach fibre cabling works – with no excavation - portable traffic signal head only, linked to notice/permit number BC006MU1WBAUSEIBZ6K2HG01
Responsibility for works: Openreach
Works reference: BC006MU1WBAUSEIBZ6K2HG02
 
Station Road, Foulsham
6–19 December
Delays likely - Traffic control (two-way signals)
Works location: Station Road - from o/s 4 to 62m NE of j/w Gunn Street
Works description: FOULSHAM 8 - DSLAM 707859 - overlay – lay approx 98m of duct 54/56 in fw/verge to link existing BT boxes to facilitate spine cabling works
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00WAPMA18X01
 
The Street, Saxthorpe
4–6 December
Delays likely - Traffic control (two-way signals)
Works location: The Street - from 39m SW of j/w Post Office Lane to 68m SW of same junction
Works description: SAXTHORPE V5001 - PON 539133 - blockages – excavate onto BT ducts for the clearance of duct blockages in to facilitate spine cabling works
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00IBUH0MDU39
 
Stony Lane, Reepham
3–5 December
Delays possible - Traffic control (multi-way signals)
Works location: Near the junction with Station Road on Stony Lane
Works description: REEPHAM 706833 - traffic management to facilitate BT Openreach fibre cabling works – with no excavation - portable traffic signal head only, linked to notice/permit number BC006MU1WBAUSEIBZ6K2HG01
Responsibility for works: Openreach
Works reference: BC006MU1WBAUSEIBZ6K2HG03
 
The Street, Heydon
7–9 December
Delays possible - Some carriageway incursion
Works location: From the junction of Heydon Road (4600285) to approx 519m NW on The Street
Works description: SAXTHORPE - V6013 - PON - To carry out overhead and underground cabling on behalf of BT
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00WALVUV3G05
 
Front Road, Wood Dalling
7–9 December
Delays unlikely - Some carriageway incursion
Works location: From the junction of Ten Acre Lane to approx 265ms on Front Road
Works description: SAXTHORPE - V6013 - PON - 683813- To carry out overhead and underground cabling via BT poles
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00WALVUV3G01
 
Heydon Road, Heydon
7–9 December
Delays unlikely - Traffic control (give & take)
Works location: From the junction of Heydon Road (4600288) to the junction of The Street on Heydon Road (4600285)
Works description: SAXTHORPE - V6013 - PON - To carry out overhead and underground cabling on behalf of BT
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00WALVUV3G04
 
Heydon Road, Wood Dalling
7–9 December
Delays unlikely - Traffic control (give & take)
Works location: From the junction of Heydon Road (4600285) to approx 1167m NW on Heydon Road (4600288)
Works description: SAXTHORPE - V6013 - PON - To carry out overhead and underground cabling on behalf of BT
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00WALVUV3G03
 
Prospect Lane, Wood Dalling
7–9 December
Delays unlikely - Some carriageway incursion
Works location: From the junction of Front Road to the junction of Heydon Road on Prospect Lane
Works description: SAXTHORPE - V6013 - PON - 683813- To carry out overhead and underground cabling via BT poles
Responsibility for works: Openreach
Works reference: BC005MU1WSEP00WALVUV3G02