Traffic restrictions and roadworks starting within the next week for the Reepham district have been issued by one.network on 17 March 2020.
A1067 Fakenham Road, Foxley
18–20 March
Delays likely - Traffic control (Stop/Go boards)
Works location: Jt sth of Manor Farm entrance, 55m nth of 35050 Old Fakenham to jt 70m sth of C226 The Street
Works description: Stud removal prior to surface dressing
Responsibility for works: Norfolk
Works reference: HU607S265ALTSR1
A1067 Fakenham Road, Foxley
25–27 March
Delays likely - Traffic control (multi-way signals)
Works location: Approach to Norwich Road/Old Fakenham Road junc - Foxley crossroads
Works description: Carriageway patching prior to surface dressing.
Responsibility for works: Norfolk
Works reference: HU606PM4126LTSC81
A1067 Norwich Road, Foxley
18–20 March
Delays likely - Traffic control (Stop/Go boards)
Works location: Jt sth of Manor Farm entrance, 55m nth of 35050 Old Fakenham to jt 70m sth of C226 The Street
Works description: Stud removal prior to surface dressing
Responsibility for works: Norfolk
Works reference: HU607S265ALTSR
A1067 Norwich Road, Foxley
25–27 March
Delays likely - Traffic control (multi-way signals)
Works location: Foxley crossroads
Works description: Carriageway patching
Responsibility for works: Norfolk
Works reference: HU606PM4126LTSC82
B1145 Dereham Road, Reepham
20–24 March
Delays likely - Traffic control (two-way signals)
Works location: Opp Townsend Court and Cob House
Works description: Carriageway patching
Responsibility for works: Norfolk
Works reference: HU608149758LTPA
B1149 Holt Road, Haveringland
23–24 March
Delays likely - Traffic control (two-way signals)
Works location: Holt Road - from 59m SE of j/w The Heath to 333m SE of same junction
Works description: HEVINGHAM V5012 - PON 549186 - Hevingham spine - tree cutting
Responsibility for works: Openreach
Works reference: BC111WAKA578G006
Guton Hall Lane, Brandiston
25–27 March
Delays likely - Road closure
Works location: 200m from The Cottage
Works description: Install double boundary box
Responsibility for works: Anglian Water
Works reference: AD01456622784
The Street, Foxley
25–27 March
Delays likely - Traffic control (multi-way signals)
Works location: Foxley Crossroads - junc Norwich Road
Works description: Carriageway patching prior to surface dressing
Responsibility for works: Norfolk
Works reference: HU606PM4126LTSC83
Old Fakenham Road, Foxley
25–27 March
Delays possible - Traffic control (multi-way signals)
Works location: Foxley crossroads junc Norwich Road
Works description: Carriageway patching prior to surface dressing
Responsibility for works: Norfolk
Works reference: HU606PM4126LTSC80
Blackwater Lane, Heydon
17–18 March
Delays unlikely - Some carriageway incursion
Works location: From the junction of Heydon footpath 1 to approx 270m east on Blackwater Lane
Works description: SAXTHORPE V5006 - PON 588759 - poling works - excavate for new BT Openreach pole(s) or to replace existing BT Openreach pole(s) in verge to facilitate overhead spine cabling works
Responsibility for works: Openreach
Works reference: BC111IBWGGCJG001
Heydon footpath 1, Heydon
17–18 March
Delays unlikely - Some carriageway incursion
Works location: From the junction of Blackwater Lane to approx 178m SW on Heydon footpath 1
Works description: SAXTHORPE V5006 - PON 588759 - POLING WORKS - Excavate for new BT Openreach Pole (s) or to Replace existing BT Openreach pole(s) in verge to facilitate overhead spine cabling works
Responsibility for works: Openreach
Works reference: BC111IBWGGCJG002